(Highways Agency) West Midlands motorway and trunk roads maintenance programme 24 - 30 November 2008
M6 Junction 8 (Ray Hall) The main southbound carriageway at M6 junction 8 will be closed from 9.00pm to 5.00am from Monday 24 November 2008 to Tuesday 25 November 2008 (1 night) for the renewal of the road markings and road studs. A diversion route will be clearly signposted via M5 junction 1.
M5 Junction 1 (West Bromwich) The southbound entry slip road of the M5 at junction 1 will be closed overnight from 9.00pm to 5.00am from Tuesday 25 November 2008 to Wednesday 3 December 2008 (8 nights) for carriageway and structural repairs. A diversion route will be clearly signposted via M6 junction 7.
M6 Junction 12 (Gailey) to M6 Junction 11 (Cannock) The M6 southbound carriageway between junctions 12 and 11 will be closed overnight from 10.00pm to 6.00am from Saturday 29 November 2008 to Sunday 30 November 2008 (1 night) for electrical and structural repairs. This will also include junction 12 southbound entry slip road. A diversion route will be clearly signposted.
Road Location Start Date End Date Works Description Traffic Management Type
A40 Ross to Monmouth 11-Nov-08 29-Nov-08 Various lane closures in operation 1900 - 0530 hrs for safety fence retensioning Lane Closure
A40 Ross to Monmouth, both directions 24-Nov-08 28-Nov-08 Lane 1 closure 0930 - 1530 hrs for asset inspections Lane Closure
A45 M42 to junction 6 to Stonebridge Island, both directions 24-Nov-08 28-Nov-08 Daily lane 1 or 2 closures as required from 0930 - 1530 hrs for drainage works Lane Closure
A46 Marraway Island to Longbridge Island, both directions 09-Jun-08 16-Jul-10 24hr Provisional nightly lane 1 closures from 2000 - 0600 hrs for Major Works For M40 Junction 15 Longbridge Bypass Works Lane Closure
A46 B4463 Junction, Sherbourne 09-Jun-08 16-Jul-10 24hr Verge works Closure for Major Works For M40 Junction 15 Longbridge Bypass Works Lane Closure
A46 A3400 to A439 northbound 21-Sep-08 12-Jan-09 24hour lane 1 closure for geotechnical works including a 40mph speed limit through the works Lane Closure
A46 Various locations 24-Nov-08 06-Feb-09 Lane 1 closure with switching in operation 0930 - 1530 hrs for gully cleaning Lane Closure with Switching
A483 A483 STATION RD PANT 24-Nov-08 05-Dec-08 TRIAL HOLE AND POSSIBLE INSTALLATION OF METER. OSWESTRY ROB JACKSON,. None
A483 Lower Sweeney 24-Nov-08 24-Nov-08 Stop & go boards in operation from 0930 - 1530 hrs for CCTV surveys Stop/Go Boards
A49 Outside Asda store, Belmont Rbt, Hereford 22-Nov-08 24-Nov-08 Various lane closures in operation 2000 - 0600 hrs with verge works during daytime hours for remedial work Lane Closure
A49 Between Ross-on-Wye and Brimfield 24-Nov-08 29-Nov-08 Various lane closures or Stop and Go boards in operation between 0900 - 1530 and 2000 - 0530 hrs for safety fence retensioning Lane Closure
A49 Stokesay 24-Nov-08 24-Nov-08 Stop & go boards in operation from 0930 - 1530 hrs for CCTV surveys Stop/Go Boards
A49 South of A4103 roundabout, Holmer, Hereford 28-Nov-08 28-Nov-08 Stop and go boards in operation 0930 - 1530 hrs for installation of data collection loops Stop/Go Boards
A49 South of Redhill Avenue, Hereford 28-Nov-08 28-Nov-08 Stop and go boards in operation 0930 - 1530 hrs for installation of data collection loops Stop/Go Boards
A49 Outside Asda store, Belmont Rbt, Hereford 29-Nov-08 01-Dec-08 Various lane closures in operation 2000 - 0600 hrs with verge works during daytime hours for remedial work Lane Closure
A5 M54 Junction 7 to Churncote, both directions 24-Nov-08 28-Nov-08 Daily mobile lane 1 or 2 closures as required from 0930 - 1530 hrs for gully emptying at various locations Mobile Lane Closure
A5 Bayston Hill Island 26-Nov-08 27-Nov-08 Various closures from 2000 - 0600 hrs for renewal of road markings Mobile Lane Closure
A5 M54 Junction 7 to Emstrey Island, westbound 27-Nov-08 29-Nov-08 Nightly lane 2 closures from 2000 - 0600 hrs for safety fence retensioning at various locations Lane Closure
M40 Junction 16 to M42 junction 3a, both directions 26-Aug-08 28-Feb-09 Various daily & nightly 24 hour closures for ATM works Lane Closure
M40 Junction 16 to Junction 14, both directions 25-Sep-08 30-Sep-09 24hour narrow lanes in operation with 50mph speed limit. Contraflow in operation 24 hours with 50mph speed limit from January 2009. This will include narrow lanes on J15 slip roads Lane Closure
M40 Junction 15 to M42 junction 3a, both directions 24-Nov-08 28-Nov-08 Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations Mobile Lane Closure
M40 Junction 16 to junction 15, southbound 24-Nov-08 29-Nov-08 Nightly lane 1 & 2 closures from 2100 - 0500 hrs for surveys and inspections at various locations Lane Closure
M42 Junction 3a to junction 7, both directions 28-Jul-08 13-Dec-08 Various nightly lane closures from 2100 - 0500 hrs for road marking and road stud renewal (No Bank Holiday Working) Lane Closure
M42 Junction 7 to junction 9, both directions 26-Aug-08 28-Aug-09 Various daily & nightly 24 hour closures for ATM works to include narrow lanes, hardshoulder running and 50mph speed limit Lane Closure
M42 Junction 1 to junction 9, both directions 24-Nov-08 28-Nov-08 Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations Mobile Lane Closure
M42 Junction 3a to junction 7, northbound 24-Nov-08 28-Nov-08 Daily mobile hardshoulder closures from 1100 - 1500 hrs for sweeping & cleansing of Emergency Refuse Bays Mobile Lane Closure
M42 Junction 6 to junction 7, northbound 24-Nov-08 29-Nov-08 Nightly lane 1 closure from 2100 - 0500 hrs for footway works at various locations Lane Closure
M42 Junction 6 to junction 7, northbound 24-Nov-08 25-Nov-08 Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections Lane Closure
M42 Junction 1 to junction 2, both directions 25-Nov-08 27-Nov-08 Nightly lane 3 closures from 2100 - 0500 hrs for safety fence repairs Lane Closure
M42 Junction 6 to junction 7, northbound 26-Nov-08 27-Nov-08 Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections Lane Closure
M42 Junction 5 to junction 6, northbound 25-Nov-08 26-Nov-08 Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections Lane Closure
M42 Junction 3a, M42 east to M42 north link road 26-Nov-08 27-Nov-08 Hardshoulder closure from 2100 - 0500 hrs for the installation of diversion route signage Lane Closure
M42 Junction 3 slip roads 27-Nov-08 28-Nov-08 Lane 1 or 2 closure as required from 2100 - 0500 hrs for the installation of diversion route signage Lane Closure
M42 Junction 7 to junction 6, southbound 27-Nov-08 28-Nov-08 Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections Lane Closure
M42 Junction 6, southbound 28-Nov-08 29-Nov-08 Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections Lane Closure
M5 Strensham services southbound entry slip 21-Dec-07 30-Jun-09 Hardshoulder closure 24 hrs for prevention of illegal parking Lane Closure
M5 Various locations between junction 9 and 5 01-Sep-08 19-Dec-08 Lane 3 closure with switching in operation 2000 - 0600 hrs for Retensioning and centre sweeping. Lane Closure with Switching
M5 Junction 8 of M6 to M5 junction 5, both directions 20-Oct-08 29-Nov-08 Various nightly lane closures from 2100 - 0500 hrs for the renewal of road markings and road studs at various locations Lane Closure
M5 Junction 4a, southbound 17-Nov-08 05-Dec-08 Weekday hardshoulder closure from 0800 - 1700 hrs for communications works Lane Closure
M5 Junction 5 to M6 junction 8, both directions 17-Nov-08 12-Dec-08 Daily mobile closures from 0930 - 1530 hrs for erection of driver location signage Mobile Lane Closure
M5 Junction 1 to junction 2, southbound 17-Nov-08 24-Nov-08 Nightly lane 1 closures from 2000 - 0600 hrs for renewal of carriageway joints Lane Closure
M5 M6 junction 8 to M5 junction 9, both directions 18-Nov-08 10-Jan-09 Daily hardshoulder closures from 0930 - 1530 hrs for installation of driver location signs at various locations (No Bank Holiday working) Lane Closure
M5 Frankley Services, both directions 24-Nov-08 05-Dec-08 Weekday hardshoulder closures from 0800 - 1700 hrs for camera installation. Lane 2 on Frankley Services slip roads as required Lane Closure
M5 Junction 4a, northbound 24-Nov-08 05-Dec-08 Weekday hardshoulder closure from 0800 - 1700 hrs for camera installation Lane Closure
M5 Junction 2 to M6 junction 8, both directions 24-Nov-08 28-Nov-08 Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations Mobile Lane Closure
M5 Junction 1 to junction 2, southbound 24-Nov-08 08-Dec-08 Nightly lane 1 & 2 closures from 2000 - 0600 hrs for renewal of carriageway joints Lane Closure
M5 Junction 5 to junction 4a, both directions 24-Nov-08 25-Nov-08 Lane 3 closures from 2100 - 0500 hrs for safety fence repairs Lane Closure
M5 Junction 2 southbound exit & northbound entry slip roads 24-Nov-08 25-Nov-08 Lane 1 closures from 2100 - 0500 hrs for sweeping & cleansing Lane Closure
M5 Junction 3 to junction 4, both directions 24-Nov-08 29-Nov-08 Nightly lane 1 closures from 2100 - 0500 hrs for the installation of driver location signage at various locations Lane Closure
M5 Junction 1 southbound entry slip road 25-Nov-08 03-Dec-08 Full overnight closure from 2100 - 0500 hrs for carriageway joint repairs Carriageway Closure
M5 Junction 1 to M6 J8, NB & SB (including J1 NB entry & SB exit slips) 25-Nov-08 27-Nov-08 Nightly lane 1 closures from 2100 - 0600 hrs for communications works for Midlands TechMAC Lane Closure
M5 Junction 5 northbound exit slip road 25-Nov-08 26-Nov-08 Lane 1 or 2 closure as required from 2100 - 0500 hrs for the installation of diversion route signage Lane Closure
M5 Junction 4a, southbound 26-Nov-08 26-Nov-08 Hardshoulder closure from 0930 - 1630 hrs for delivery of equipment to transmission station Lane Closure
M5 Junction 3 northbound entry slip road 27-Nov-08 29-Nov-08 Nightly lane closures from 2100 - 0500 hrs for electrical works Lane Closure
M50 Junction 1 and junction 2, eastbound 13-May-07 30-Jun-09 Hard shoulder closure 24 hours for safety due to embankment subsidence Lane Closure
M50 Between junction 2 and 3 12-Nov-07 30-Jun-09 Hard shoulder closure in operation 2000 - 0630 hrs Changing to 24hr Closure from 04/12/2007 for upgrade to the VSF Lane Closure
M50 Junction 1 to junction 2, both directions 31-Aug-08 17-Jan-09 24 hour lane 1 or 2 closures from 31/8/09 - 18/09/08 then contraflow from 19/9/08 for Queenhill Viaduct Major Maintenance Scheme. Works consist of barrier replacement, verge reconstruction, new kerbs, re-waterproofing and resurfacing (40mph speed limit) Contraflow
M50 Junction 3 to junction 4, both directions 24-Nov-08 25-Nov-08 Lane 2 closures from 2100 - 0600 hrs for matrix signal repairs Lane Closure
M50 Junction 2 to junction 3, both directions 26-Nov-08 26-Nov-08 Lane 1 closures from 0930 - 1530 hrs for bridge inspections Lane Closure
M54 M6 Junction 10a to M54 junction 2, both directions 03-Nov-08 21-Aug-09 Various 24 hour hardshoulder and overnight (2100 - 0500) lane closures for signal and Midas upgrade at various locations (PHASE 1) Lane Closure with Switching
M54 Junction 2 westbound exit & entry slip roads 17-Nov-08 29-Nov-08 Daily (0930 - 1530 hrs) & nightly (2100 - 0500 hrs) lane 1 or 2 closure as required for communications works as part of the MIDAS contract Lane Closure
M54 Junction 1 westbound exit & entry slip roads 17-Nov-08 29-Nov-08 Daily (0930 - 1530 hrs) & nightly (2100 - 0500 hrs) lane 1 or 2 closure as required for communications works as part of the MIDAS contract Lane Closure
M54 M54 junction 4 to A5 Preston Island, both directions 24-Nov-08 26-Nov-08 Nightly mobile lane 1 or 2 closures as required from 2000 - 0600 hrs for inspections & surveys at various locations Mobile Lane Closure
M54 Junction 6 eastbound exit & entry slip roads 24-Nov-08 27-Nov-08 Nightly lane 1 or 2 closures as required from 2100 - 0500 hrs for the installation of diversion route signage Lane Closure
M54 Junction 4, both directions 25-Nov-08 26-Nov-08 Lane 2 closures from 2100 - 0600 hrs for communications works for Midlands TechMAC Lane Closure
M6 Junction 4 to junction 5, both directions 27-Aug-08 31-Oct-09 Various daily & nightly 24 hour closures for ATM works to include narrow lanes, hardshoulder running and 50mph speed limit Lane Closure
M6 Junction 10a to junction 11, both directions 03-Nov-08 21-Aug-09 Various 24 hour hardshoulder and overnight (2100 - 0500) lane closures for signal and Midas upgrade at various locations (PHASE 1) Lane Closure with Switching
M6 M6 Junction 8 to M5 junction 1, southbound 17-Nov-08 05-Dec-08 Weekday hardshoulder closure from 0800 - 1700 hrs for communications works Lane Closure
M6 Junction 12 to junction 11a, southbound 17-Nov-08 16-Dec-08 Weekday hardshoulder closure from 0900 - 1600 hrs for communications works for Motorway Access Management Scheme. To include hardshoulder on J12 entry slip road Lane Closure
M6 Junction 11 northbound entry slip road 17-Nov-08 05-Dec-08 Weekday Lane 1 or 2 closures from 0930 - 1530 hrs as part of the MIDAS works Lane Closure
M6 Junction 11a, southbound 17-Nov-08 05-Dec-08 Weekday hardshoulder closure from 0800 - 1700 hrs for communications works Lane Closure
M6 Junction 6 to junction 5, southbound 22-Nov-08 24-Nov-08 Nightly lane 1 closure from 2100 - 0500 hrs for bridge parapet wall repairs Lane Closure
M6 Junction 6 link roads 24-Nov-08 28-Nov-08 Daily hardshoulder closures from 0930 - 1530 hrs for routine maintenance works Lane Closure
M6 Junction 5 to junction 12, both directions 24-Nov-08 28-Nov-08 Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations Mobile Lane Closure
M6 M5 Junction 1 to M6 junction 8, northbound 24-Nov-08 26-Nov-08 Daily hardshoulder closure from 0930 - 1530 for safety fence retensioning Lane Closure
M6 Junction 7 to junction 8, northbound 24-Nov-08 24-Nov-08 Lane 1 closure from 2100 - 2330 hrs for cable replacement works Lane Closure
M6 Junction 8, southbound 24-Nov-08 25-Nov-08 Full overnight closure from 2100 - 0500 hrs for renewal of road studs and road markings Carriageway Closure
M6 Junction 8 to junction 9, both directions 25-Nov-08 25-Nov-08 Hardshoulder closure from 0930 - 1530 hrs for structural inspections Lane Closure
M6 Junction 6, City to M6 north link road 25-Nov-08 26-Nov-08 Lane 1 closures from 2100 - 0500 hrs for sweeping & cleansing Lane Closure
M6 Junction 9, both directions 26-Nov-08 26-Nov-08 Hardshoulder closure from 0930 - 1530 hrs for structural inspections Lane Closure
M6 M6 S/B Jct 11 Entry Slip 26-Nov-08 26-Nov-08 Installation of concrete barriers Lane Closure
M6 Junction 8 to junction 6, both direction 26-Nov-08 27-Nov-08 Lane 3 closures from 2100 - 0500 hrs for sweeping, cleansing and drainage works Lane Closure
M6 Junction 10 to junction 9, southbound 27-Nov-08 28-Nov-08 Daily hardshoulder closure from 0800 - 1700 hrs for electrical works Lane Closure
M6 Junction 11a to junction 12, northbound (includes J12 NB exit slip) 27-Nov-08 28-Nov-08 lane 1 closures from 2100 - 0600 hrs for communications works for Midlands TechMAC Lane Closure
M6 Junction 6, M6 south to City link road 27-Nov-08 28-Nov-08 Lane 2 closures from 2100 - 0500 hrs for sweeping & cleansing Lane Closure
M6 Junction 8 to junction 9, northbound 27-Nov-08 28-Nov-08 Lane 1 closure from 2130 - 0600 hrs for overhead sign works for Midlands TechMAC Lane Closure
M6 Junction 8, southbound 27-Nov-08 28-Nov-08 Lane 1 closure from 2130 - 0600 hrs for overhead sign works for Midlands TechMAC Lane Closure
M6 Junction 10 to junction 10a, northbound 28-Nov-08 29-Nov-08 Lane 2 & 3 closure from 2100 - 050 hrs for structural inspections Lane Closure
M6 Junction 7 northbound exit slip road 28-Nov-08 29-Nov-08 Lane 2 closure from 2100 - 0500 hrs for the installation of diversion route signage Lane Closure
M6 Junction 10 northbound & southbound entry slip roads 28-Nov-08 29-Nov-08 Lane 2 closures from 2100 - 0500 hrs for the installation of diversion route signage Lane Closure
M6 Junction 12 to 11, southbound (includes J12 SB entry slip road) 29-Nov-08 30-Nov-08 Full overnight closure from 2200 - 0600 hrs for street lighting and structural maintenance works Carriageway Closure
M6 Junction 6, M6 south to Salford Circus Link Road 30-Nov-08 01-Dec-08 Lane 1 closure from 2000 - 0600 hrs for electrical works Lane Closure
|