(Highways Agency) West Midlands motorway and trunk roads maintenance programme 24 - 30 November 2008

M6 Junction 8 (Ray Hall)
The main southbound carriageway at M6 junction 8 will be closed from 9.00pm to 5.00am from Monday 24 November 2008 to Tuesday 25 November 2008 (1 night) for the renewal of the road markings and road studs. A diversion route will be clearly signposted via M5 junction 1.

M5 Junction 1 (West Bromwich)
The southbound entry slip road of the M5 at junction 1 will be closed overnight from 9.00pm to 5.00am from Tuesday 25 November 2008 to Wednesday 3 December 2008 (8 nights) for carriageway and structural repairs. A diversion route will be clearly signposted via M6 junction 7.

M6 Junction 12 (Gailey) to M6 Junction 11 (Cannock)
The M6 southbound carriageway between junctions 12 and 11 will be closed overnight from 10.00pm to 6.00am from Saturday 29 November 2008 to Sunday 30 November 2008 (1 night) for electrical and structural repairs. This will also include junction 12 southbound entry slip road. A diversion route will be clearly signposted.


Road
Location
Start Date
End Date
Works Description
Traffic Management Type

A40
Ross to Monmouth
11-Nov-08
29-Nov-08
Various lane closures in operation 1900 - 0530 hrs for safety fence retensioning
Lane Closure

A40
Ross to Monmouth, both directions
24-Nov-08
28-Nov-08
Lane 1 closure 0930 - 1530 hrs for asset inspections
Lane Closure

A45
M42 to junction 6 to Stonebridge Island, both directions
24-Nov-08
28-Nov-08
Daily lane 1 or 2 closures as required from 0930 - 1530 hrs for drainage works
Lane Closure

A46
Marraway Island to Longbridge Island, both directions
09-Jun-08
16-Jul-10
24hr Provisional nightly lane 1 closures from 2000 - 0600 hrs for Major Works For M40 Junction 15 Longbridge Bypass Works
Lane Closure

A46
B4463 Junction, Sherbourne
09-Jun-08
16-Jul-10
24hr Verge works Closure for Major Works For M40 Junction 15 Longbridge Bypass Works
Lane Closure

A46
A3400 to A439 northbound
21-Sep-08
12-Jan-09
24hour lane 1 closure for geotechnical works including a 40mph speed limit through the works
Lane Closure

A46
Various locations
24-Nov-08
06-Feb-09
Lane 1 closure with switching in operation 0930 - 1530 hrs for gully cleaning
Lane Closure with Switching

A483
A483 STATION RD PANT
24-Nov-08
05-Dec-08
TRIAL HOLE AND POSSIBLE INSTALLATION OF METER. OSWESTRY ROB JACKSON,.
None

A483
Lower Sweeney
24-Nov-08
24-Nov-08
Stop & go boards in operation from 0930 - 1530 hrs for CCTV surveys
Stop/Go Boards

A49
Outside Asda store, Belmont Rbt, Hereford
22-Nov-08
24-Nov-08
Various lane closures in operation 2000 - 0600 hrs with verge works during daytime hours for remedial work
Lane Closure

A49
Between Ross-on-Wye and Brimfield
24-Nov-08
29-Nov-08
Various lane closures or Stop and Go boards in operation between 0900 - 1530 and 2000 - 0530 hrs for safety fence retensioning
Lane Closure

A49
Stokesay
24-Nov-08
24-Nov-08
Stop & go boards in operation from 0930 - 1530 hrs for CCTV surveys
Stop/Go Boards

A49
South of A4103 roundabout, Holmer, Hereford
28-Nov-08
28-Nov-08
Stop and go boards in operation 0930 - 1530 hrs for installation of data collection loops
Stop/Go Boards

A49
South of Redhill Avenue, Hereford
28-Nov-08
28-Nov-08
Stop and go boards in operation 0930 - 1530 hrs for installation of data collection loops
Stop/Go Boards

A49
Outside Asda store, Belmont Rbt, Hereford
29-Nov-08
01-Dec-08
Various lane closures in operation 2000 - 0600 hrs with verge works during daytime hours for remedial work
Lane Closure

A5
M54 Junction 7 to Churncote, both directions
24-Nov-08
28-Nov-08
Daily mobile lane 1 or 2 closures as required from 0930 - 1530 hrs for gully emptying at various locations
Mobile Lane Closure

A5
Bayston Hill Island
26-Nov-08
27-Nov-08
Various closures from 2000 - 0600 hrs for renewal of road markings
Mobile Lane Closure

A5
M54 Junction 7 to Emstrey Island, westbound
27-Nov-08
29-Nov-08
Nightly lane 2 closures from 2000 - 0600 hrs for safety fence retensioning at various locations
Lane Closure

M40
Junction 16 to M42 junction 3a, both directions
26-Aug-08
28-Feb-09
Various daily & nightly 24 hour closures for ATM works
Lane Closure

M40
Junction 16 to Junction 14, both directions
25-Sep-08
30-Sep-09
24hour narrow lanes in operation with 50mph speed limit. Contraflow in operation 24 hours with 50mph speed limit from January 2009. This will include narrow lanes on J15 slip roads
Lane Closure

M40
Junction 15 to M42 junction 3a, both directions
24-Nov-08
28-Nov-08
Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations
Mobile Lane Closure

M40
Junction 16 to junction 15, southbound
24-Nov-08
29-Nov-08
Nightly lane 1 & 2 closures from 2100 - 0500 hrs for surveys and inspections at various locations
Lane Closure

M42
Junction 3a to junction 7, both directions
28-Jul-08
13-Dec-08
Various nightly lane closures from 2100 - 0500 hrs for road marking and road stud renewal (No Bank Holiday Working)
Lane Closure

M42
Junction 7 to junction 9, both directions
26-Aug-08
28-Aug-09
Various daily & nightly 24 hour closures for ATM works to include narrow lanes, hardshoulder running and 50mph speed limit
Lane Closure

M42
Junction 1 to junction 9, both directions
24-Nov-08
28-Nov-08
Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations
Mobile Lane Closure

M42
Junction 3a to junction 7, northbound
24-Nov-08
28-Nov-08
Daily mobile hardshoulder closures from 1100 - 1500 hrs for sweeping & cleansing of Emergency Refuse Bays
Mobile Lane Closure

M42
Junction 6 to junction 7, northbound
24-Nov-08
29-Nov-08
Nightly lane 1 closure from 2100 - 0500 hrs for footway works at various locations
Lane Closure

M42
Junction 6 to junction 7, northbound
24-Nov-08
25-Nov-08
Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections
Lane Closure

M42
Junction 1 to junction 2, both directions
25-Nov-08
27-Nov-08
Nightly lane 3 closures from 2100 - 0500 hrs for safety fence repairs
Lane Closure

M42
Junction 6 to junction 7, northbound
26-Nov-08
27-Nov-08
Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections
Lane Closure

M42
Junction 5 to junction 6, northbound
25-Nov-08
26-Nov-08
Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections
Lane Closure

M42
Junction 3a, M42 east to M42 north link road
26-Nov-08
27-Nov-08
Hardshoulder closure from 2100 - 0500 hrs for the installation of diversion route signage
Lane Closure

M42
Junction 3 slip roads
27-Nov-08
28-Nov-08
Lane 1 or 2 closure as required from 2100 - 0500 hrs for the installation of diversion route signage
Lane Closure

M42
Junction 7 to junction 6, southbound
27-Nov-08
28-Nov-08
Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections
Lane Closure

M42
Junction 6, southbound
28-Nov-08
29-Nov-08
Lanes 2 & 3 closed followed by lane 1 as required from 2100 - 0500 hrs for structural inspections
Lane Closure

M5
Strensham services southbound entry slip
21-Dec-07
30-Jun-09
Hardshoulder closure 24 hrs for prevention of illegal parking
Lane Closure

M5
Various locations between junction 9 and 5
01-Sep-08
19-Dec-08
Lane 3 closure with switching in operation 2000 - 0600 hrs for Retensioning and centre sweeping.
Lane Closure with Switching

M5
Junction 8 of M6 to M5 junction 5, both directions
20-Oct-08
29-Nov-08
Various nightly lane closures from 2100 - 0500 hrs for the renewal of road markings and road studs at various locations
Lane Closure

M5
Junction 4a, southbound
17-Nov-08
05-Dec-08
Weekday hardshoulder closure from 0800 - 1700 hrs for communications works
Lane Closure

M5
Junction 5 to M6 junction 8, both directions
17-Nov-08
12-Dec-08
Daily mobile closures from 0930 - 1530 hrs for erection of driver location signage
Mobile Lane Closure

M5
Junction 1 to junction 2, southbound
17-Nov-08
24-Nov-08
Nightly lane 1 closures from 2000 - 0600 hrs for renewal of carriageway joints
Lane Closure

M5
M6 junction 8 to M5 junction 9, both directions
18-Nov-08
10-Jan-09
Daily hardshoulder closures from 0930 - 1530 hrs for installation of driver location signs at various locations (No Bank Holiday working)
Lane Closure

M5
Frankley Services, both directions
24-Nov-08
05-Dec-08
Weekday hardshoulder closures from 0800 - 1700 hrs for camera installation. Lane 2 on Frankley Services slip roads as required
Lane Closure

M5
Junction 4a, northbound
24-Nov-08
05-Dec-08
Weekday hardshoulder closure from 0800 - 1700 hrs for camera installation
Lane Closure

M5
Junction 2 to M6 junction 8, both directions
24-Nov-08
28-Nov-08
Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations
Mobile Lane Closure

M5
Junction 1 to junction 2, southbound
24-Nov-08
08-Dec-08
Nightly lane 1 & 2 closures from 2000 - 0600 hrs for renewal of carriageway joints
Lane Closure

M5
Junction 5 to junction 4a, both directions
24-Nov-08
25-Nov-08
Lane 3 closures from 2100 - 0500 hrs for safety fence repairs
Lane Closure

M5
Junction 2 southbound exit & northbound entry slip roads
24-Nov-08
25-Nov-08
Lane 1 closures from 2100 - 0500 hrs for sweeping & cleansing
Lane Closure

M5
Junction 3 to junction 4, both directions
24-Nov-08
29-Nov-08
Nightly lane 1 closures from 2100 - 0500 hrs for the installation of driver location signage at various locations
Lane Closure

M5
Junction 1 southbound entry slip road
25-Nov-08
03-Dec-08
Full overnight closure from 2100 - 0500 hrs for carriageway joint repairs
Carriageway Closure

M5
Junction 1 to M6 J8, NB & SB (including J1 NB entry & SB exit slips)
25-Nov-08
27-Nov-08
Nightly lane 1 closures from 2100 - 0600 hrs for communications works for Midlands TechMAC
Lane Closure

M5
Junction 5 northbound exit slip road
25-Nov-08
26-Nov-08
Lane 1 or 2 closure as required from 2100 - 0500 hrs for the installation of diversion route signage
Lane Closure

M5
Junction 4a, southbound
26-Nov-08
26-Nov-08
Hardshoulder closure from 0930 - 1630 hrs for delivery of equipment to transmission station
Lane Closure

M5
Junction 3 northbound entry slip road
27-Nov-08
29-Nov-08
Nightly lane closures from 2100 - 0500 hrs for electrical works
Lane Closure

M50
Junction 1 and junction 2, eastbound
13-May-07
30-Jun-09
Hard shoulder closure 24 hours for safety due to embankment subsidence
Lane Closure

M50
Between junction 2 and 3
12-Nov-07
30-Jun-09
Hard shoulder closure in operation 2000 - 0630 hrs Changing to 24hr Closure from 04/12/2007 for upgrade to the VSF
Lane Closure

M50
Junction 1 to junction 2, both directions
31-Aug-08
17-Jan-09
24 hour lane 1 or 2 closures from 31/8/09 - 18/09/08 then contraflow from 19/9/08 for Queenhill Viaduct Major Maintenance Scheme. Works consist of barrier replacement, verge reconstruction, new kerbs, re-waterproofing and resurfacing (40mph speed limit)
Contraflow

M50
Junction 3 to junction 4, both directions
24-Nov-08
25-Nov-08
Lane 2 closures from 2100 - 0600 hrs for matrix signal repairs
Lane Closure

M50
Junction 2 to junction 3, both directions
26-Nov-08
26-Nov-08
Lane 1 closures from 0930 - 1530 hrs for bridge inspections
Lane Closure

M54
M6 Junction 10a to M54 junction 2, both directions
03-Nov-08
21-Aug-09
Various 24 hour hardshoulder and overnight (2100 - 0500) lane closures for signal and Midas upgrade at various locations (PHASE 1)
Lane Closure with Switching

M54
Junction 2 westbound exit & entry slip roads
17-Nov-08
29-Nov-08
Daily (0930 - 1530 hrs) & nightly (2100 - 0500 hrs) lane 1 or 2 closure as required for communications works as part of the MIDAS contract
Lane Closure

M54
Junction 1 westbound exit & entry slip roads
17-Nov-08
29-Nov-08
Daily (0930 - 1530 hrs) & nightly (2100 - 0500 hrs) lane 1 or 2 closure as required for communications works as part of the MIDAS contract
Lane Closure

M54
M54 junction 4 to A5 Preston Island, both directions
24-Nov-08
26-Nov-08
Nightly mobile lane 1 or 2 closures as required from 2000 - 0600 hrs for inspections & surveys at various locations
Mobile Lane Closure

M54
Junction 6 eastbound exit & entry slip roads
24-Nov-08
27-Nov-08
Nightly lane 1 or 2 closures as required from 2100 - 0500 hrs for the installation of diversion route signage
Lane Closure

M54
Junction 4, both directions
25-Nov-08
26-Nov-08
Lane 2 closures from 2100 - 0600 hrs for communications works for Midlands TechMAC
Lane Closure

M6
Junction 4 to junction 5, both directions
27-Aug-08
31-Oct-09
Various daily & nightly 24 hour closures for ATM works to include narrow lanes, hardshoulder running and 50mph speed limit
Lane Closure

M6
Junction 10a to junction 11, both directions
03-Nov-08
21-Aug-09
Various 24 hour hardshoulder and overnight (2100 - 0500) lane closures for signal and Midas upgrade at various locations (PHASE 1)
Lane Closure with Switching

M6
M6 Junction 8 to M5 junction 1, southbound
17-Nov-08
05-Dec-08
Weekday hardshoulder closure from 0800 - 1700 hrs for communications works
Lane Closure

M6
Junction 12 to junction 11a, southbound
17-Nov-08
16-Dec-08
Weekday hardshoulder closure from 0900 - 1600 hrs for communications works for Motorway Access Management Scheme. To include hardshoulder on J12 entry slip road
Lane Closure

M6
Junction 11 northbound entry slip road
17-Nov-08
05-Dec-08
Weekday Lane 1 or 2 closures from 0930 - 1530 hrs as part of the MIDAS works
Lane Closure

M6
Junction 11a, southbound
17-Nov-08
05-Dec-08
Weekday hardshoulder closure from 0800 - 1700 hrs for communications works
Lane Closure

M6
Junction 6 to junction 5, southbound
22-Nov-08
24-Nov-08
Nightly lane 1 closure from 2100 - 0500 hrs for bridge parapet wall repairs
Lane Closure

M6
Junction 6 link roads
24-Nov-08
28-Nov-08
Daily hardshoulder closures from 0930 - 1530 hrs for routine maintenance works
Lane Closure

M6
Junction 5 to junction 12, both directions
24-Nov-08
28-Nov-08
Daily mobile closures from 0930 - 1530 hrs for hardshoulder sweeping at various locations
Mobile Lane Closure

M6
M5 Junction 1 to M6 junction 8, northbound
24-Nov-08
26-Nov-08
Daily hardshoulder closure from 0930 - 1530 for safety fence retensioning
Lane Closure

M6
Junction 7 to junction 8, northbound
24-Nov-08
24-Nov-08
Lane 1 closure from 2100 - 2330 hrs for cable replacement works
Lane Closure

M6
Junction 8, southbound
24-Nov-08
25-Nov-08
Full overnight closure from 2100 - 0500 hrs for renewal of road studs and road markings
Carriageway Closure

M6
Junction 8 to junction 9, both directions
25-Nov-08
25-Nov-08
Hardshoulder closure from 0930 - 1530 hrs for structural inspections
Lane Closure

M6
Junction 6, City to M6 north link road
25-Nov-08
26-Nov-08
Lane 1 closures from 2100 - 0500 hrs for sweeping & cleansing
Lane Closure

M6
Junction 9, both directions
26-Nov-08
26-Nov-08
Hardshoulder closure from 0930 - 1530 hrs for structural inspections
Lane Closure

M6
M6 S/B Jct 11 Entry Slip
26-Nov-08
26-Nov-08
Installation of concrete barriers
Lane Closure

M6
Junction 8 to junction 6, both direction
26-Nov-08
27-Nov-08
Lane 3 closures from 2100 - 0500 hrs for sweeping, cleansing and drainage works
Lane Closure

M6
Junction 10 to junction 9, southbound
27-Nov-08
28-Nov-08
Daily hardshoulder closure from 0800 - 1700 hrs for electrical works
Lane Closure

M6
Junction 11a to junction 12, northbound (includes J12 NB exit slip)
27-Nov-08
28-Nov-08
lane 1 closures from 2100 - 0600 hrs for communications works for Midlands TechMAC
Lane Closure

M6
Junction 6, M6 south to City link road
27-Nov-08
28-Nov-08
Lane 2 closures from 2100 - 0500 hrs for sweeping & cleansing
Lane Closure

M6
Junction 8 to junction 9, northbound
27-Nov-08
28-Nov-08
Lane 1 closure from 2130 - 0600 hrs for overhead sign works for Midlands TechMAC
Lane Closure

M6
Junction 8, southbound
27-Nov-08
28-Nov-08
Lane 1 closure from 2130 - 0600 hrs for overhead sign works for Midlands TechMAC
Lane Closure

M6
Junction 10 to junction 10a, northbound
28-Nov-08
29-Nov-08
Lane 2 & 3 closure from 2100 - 050 hrs for structural inspections
Lane Closure

M6
Junction 7 northbound exit slip road
28-Nov-08
29-Nov-08
Lane 2 closure from 2100 - 0500 hrs for the installation of diversion route signage
Lane Closure

M6
Junction 10 northbound & southbound entry slip roads
28-Nov-08
29-Nov-08
Lane 2 closures from 2100 - 0500 hrs for the installation of diversion route signage
Lane Closure

M6
Junction 12 to 11, southbound (includes J12 SB entry slip road)
29-Nov-08
30-Nov-08
Full overnight closure from 2200 - 0600 hrs for street lighting and structural maintenance works
Carriageway Closure

M6
Junction 6, M6 south to Salford Circus Link Road
30-Nov-08
01-Dec-08
Lane 1 closure from 2000 - 0600 hrs for electrical works